52古典>英语词典>railroad line翻译和用法

railroad line

英 [ˈreɪlrəʊd laɪn]

美 [ˈreɪlroʊd laɪn]

网络  铁路线

英英释义

noun

双语例句

  • In order to alleviate the status of tight transport capacity and meet the fast-growing demand on railroad passenger transportation, large-scale development and construction of passenger dedicated line has been carried on in our country to improve our comprehensive traffic transportation system and the traffic transportation quality.
    为缓解目前我国运能紧张的状况和满足我国快速增长的旅客运输需求,我国进行了大规模的客运专线建设,以完善整个交通运输体系,提高交通运输质量。
  • Engineering Plan of Soil and Water Conservation for Construction of Railroad Special Line of Tuo Electric Power A
    托电A厂铁路专用线水保方案工程措施设计
  • The railroad line design is one part of the entire railroad construction, further more, the design method being correct or not and the design quality being good or poor are of the pivotal significance to the cost of the railroad project.
    其中,铁路线路设计工作是在整个铁路建设中的一个环节,设计方法的正确与否和设计质量的好坏对铁路工程造价的高低具有举足轻重的意义。
  • Up to at present, the financing channel for the railroad new line construction extremely was unitary, but also did not have to bring into market operation officially. But this tendency was inevitable.
    截至目前,铁路新线建设的融资渠道仍然十分单一,还没有正式纳入市场运作,但是相信这一趋势是必然的,所以本文的基础研究是在市场化这一前瞻性假设下来讨论的。
  • On the road to Sittard, he noticed three English tanks in position west of the railroad line.
    在前往锡塔德的路上,他发现铁路线西面部署着三辆英国的坦克。
  • In order to provide some theoretic basis for similar areas, soil physiochemical properties in shelter belt of Jining-Erlinhot railroad line were studied by using classical statistics.
    应用经典统计学方法,对集宁-二连浩特铁路沿线防护林土壤理化特性进行了研究。
  • With a review of railroad reconstruction since 1949 and the present state the railway is facing, the article calls for a sound approach to planning new line construction and existing line modification, and an integrated and comprehensive handling of the two issues.
    本文阐述了建国以来铁路建设的情况及面临的现状,提出应正确处理新线建设与旧线改造的关系,把新线建设和旧线改造作为一个有机整体统筹考虑。
  • Research on the construction methods of the hydraulic tunnel under the present railroad line
    既有铁路线下水工隧洞的施工技术研究
  • In order to solve the railway transportation "the bottleneck" striction, there must be to realize the surmount development for the high-speed railroad passenger transportation special line construction.
    为解决铁路运输瓶颈制约,必须实现铁路跨越式发展,大力发展高速铁路客运专线建设。
  • Railroad Line Selection in Loess Hilly Areas
    黄土丘陵区的铁路选线